Ethiopia to Form Coastal Police for GERD Security

Ethiopia to Establish Coastal Police to Safeguard Grand Ethiopian Renaissance Dam

The Ethiopian Federal Police has announced the establishment of a new security force known as the “Coastal Police” or “Coastal Police Guard,” tasked with protecting the artificial lake formed by the Grand Ethiopian Renaissance Dam (GERD).

This force will be responsible for ensuring the safety and security of the dam’s extensive water body, which is one of the largest artificial lakes in the region.

Commander Eskedar Berhan, Head of the Inspection and Standards Department under the Federal Police’s Military Construction Directorate, stated that the formation of the Coastal Police aims to prevent criminal activity around the GERD reservoir and to provide rapid response capabilities.

As the artificial lake becomes operational, the Federal Police will oversee its security operations.

Preparations are already underway to enhance the logistical infrastructure necessary to support the new unit.

Commander Eskedar also emphasized that the newly formed force is being structured based on international standards for crime prevention, rapid intervention, and anti-piracy operations.

Special attention is being given to equipping the unit with the capability to address potential threats, including armed maritime piracy on the dam’s waters.

The recruitment and training of qualified personnel for this specialized unit will be conducted in partnership with the Ethiopian Navy.

While recruitment is expected to begin soon, the official launch date of the Coastal Police has not yet been determined.

This initiative marks the first time Ethiopia is establishing a dedicated water-based police unit, reflecting the strategic importance of the GERD.

The Grand Ethiopian Renaissance Dam, whose construction began 15 years ago, is now reportedly 98% complete.

Originally launched 14 years ago with the laying of its foundation stone, the project has already consumed over 180 billion birr, with an estimated 80 billion birr needed to finalize the remaining works.

Currently, the dam is generating 540 megawatts of electricity from two operational turbines.

Upon full completion, the dam is projected to produce up to 5,150 megawatts, making it the largest hydropower project in Africa.

The dam’s reservoir presently holds over 42 billion cubic meters of water and is expected to reach a total capacity of 74 billion cubic meters.

Prime Minister Abiy Ahmed recently stated that the dam’s construction will be fully completed within the next six months.

When fully operational, the GERD will consist of seven generating units.

Despite its domestic significance, the GERD has been a source of international tension. Egypt and Sudan have strongly opposed the dam since its inception, citing concerns over water security.

Although tripartite negotiations involving Ethiopia, Egypt, and Sudan have been ongoing for 13 years, they have yet to yield a final agreement.

While Egypt accuses Ethiopia of stalling negotiations, Ethiopia maintains that Egypt is seeking to uphold colonial-era water-sharing arrangements, which it considers outdated and unfair.

By ethionegari@gmail.com

Leave a Reply

Your email address will not be published. Required fields are marked *